Hitachi Zosen Inova Schmack GmbH

Detail informationen

Testing Laboratory

Hitachi Zosen Inova Schmack GmbH

Bayernwerk 8, 92421 Schwandorf, Germany
D-PL-14051-01-00 | Issue date: 14.03.2022

Kurzschreibung des Geltungsbereichs

physikalische, physikalisch-chemische und chemische Untersuchungen von Wasser, Abwasser, Schlamm, Abfall, Klärschlamm, nachwachsenden Rohstoffen, Kompost, Gärprodukten, Gärrückständen und Bioabfall; Probenahme von Abwasser, Wasser aus stehenden Gewässern, Fließgewässern und von Abfall; Fachmodul Abfall

Short description of the scope (machine translation)

physical, physico-chemical and chemical analysis of water, sewage, mud, waste, sewage sludge, renewable raw material, compost, fermentation products, fermented wastes and biowaste; sampling of sewage, water from stagnant water, running water and of waste; expert modul waste
External content of Google Maps is integrated here. Click on the button to display the map. The content can also be hidden again if required.

I consent to external content being displayed to me. This allows personal data to be transmitted to third party platforms. You can find out more about this in our data protection declaration.

Note on the certificate status

In addition to the currently valid accreditations, the database of accredited bodies also contains information on withdrawn and suspended accreditation certificates. The status of an accreditation is displayed in the search results. The filter “certificate status” enables a limitation of the search results.

  • Active: These accreditations are valid without restrictions.
  • Suspended: These accreditations are temporarily restricted, either in full (“fully suspended”) or for part of the scope of the accreditation (“partially suspended”).
  • Withdrawn: These accreditations have been withdrawn for the entire scope in the past six months.

Suspension or withdrawal of accreditation occurs, among other things, when an accredited conformity assessment body no longer fulfils the relevant conditions for accreditation, does not comply with the requirements placed on it, does not follow the accreditation rules or has voluntarily requested suspension or withdrawal.

The requirement to make the status of an accreditation publicly available results from the standard ISO/IEC 17011, which DAkkS is obliged to comply with.

Nach oben