Büro für Umweltplanung Spoo & Pittner GmbH

Detail informationen

Testing Laboratory

Büro für Umweltplanung Spoo & Pittner GmbH

Zur Festung 13, 54318 Mertesdorf, Germany
D-PL-19785-01-00 | Issue date: 12.12.2019

Kurzschreibung des Geltungsbereichs

Probenahme und Vor-Ort-Untersuchungen von Wasser (Grund- und Rohwasser, Abwasser, Wasser aus stehenden Gewässern, Fließgewässern); Probenahme von Böden, Abfällen, Stoffen zur Verwertung, Bodenluft und Innenraumluft, Probenahme zur Untersuchung von Haustäuben und Materialproben auf Schadstoffe in Gebäuden; ausgewählte physikalisch-chemische Untersuchungen zur Wasserprobenahme; bodenphysikalische Untersuchungen; Fachmodule Abfall, Wasser sowie Boden und Altlasten

Short description of the scope (machine translation)

sampling and before-location-analysis of water (ground- and raw water, sewage, water from stagnant water, running water); sampling of grounds, wastes, materials for reuse, soil gas and indoor air, sampling for analysis of Household dust and materials samples at pollution in buildings; selected physico-chemical analysis for water sampling; soil physical analysis; modul waste, water as well as soil and old neglected deposits of toxic waste
External content of Google Maps is integrated here. Click on the button to display the map. The content can also be hidden again if required.

I consent to external content being displayed to me. This allows personal data to be transmitted to third party platforms. You can find out more about this in our data protection declaration.

Note on the certificate status

In addition to the currently valid accreditations, the database of accredited bodies also contains information on withdrawn and suspended accreditation certificates. The status of an accreditation is displayed in the search results. The filter “certificate status” enables a limitation of the search results.

  • Active: These accreditations are valid without restrictions.
  • Suspended: These accreditations are temporarily restricted, either in full (“fully suspended”) or for part of the scope of the accreditation (“partially suspended”).
  • Withdrawn: These accreditations have been withdrawn for the entire scope in the past six months.

Suspension or withdrawal of accreditation occurs, among other things, when an accredited conformity assessment body no longer fulfils the relevant conditions for accreditation, does not comply with the requirements placed on it, does not follow the accreditation rules or has voluntarily requested suspension or withdrawal.

The requirement to make the status of an accreditation publicly available results from the standard ISO/IEC 17011, which DAkkS is obliged to comply with.

Nach oben